Combustion Engineering Inc.

Society: ASME Main Category: Mechanical Sub Category: Manufacturing Era: 1930-1939 DateCreated: 1930 ABB Combustion Engineering Chattanooga State: TN Zip: 37402 Country: USA Website: http://www.asme.org/about-asme/history/landmarks/topics-m-z/manufacturing---1/-44-fusion-welded-test-boiler-drum-%281930%29 Creator: Combustion Engineering Inc., Moses, A. J.
This fusion-welded drum, tested during 1930, was the first in a series tested at Combustion Engineering Inc. that led to the industrial acceptance of welding for the fabrication of boiler drums. Replacing riveting for steam power plants, electric arc fusion welding permitted increased efficiencies through higher working pressures and temperatures and fabrication of larger units of improved safety. Welding was then rapidly extended to fabrication using optimum alloys for pressure vessel and structural application. Papers published by A. J.
YearAdded:
1980
Image Credit: Image source: Engrailhistory.info Image Caption: Fusion-welded Test Boiler Drum Era_date_from: 1930
Eddystone Station Unit #1
Society: ASME Main Category: Electric, Mechanical Sub Category: Steam Era: 1960-1969 DateCreated: 1960 #1 Industrial Highway Eddystone State: PA Zip: 19013 Country: USA Website: http://www.asme.org/about-asme/history/landmarks/topics-a-l/electric-power-production-steam/-226-eddystone-station-unit--1-%281960%29 Creator: Combustion Engineering Inc., Westinghouse Electric

Operated by the Philadelphia Electric Company (PECO), now known as Exelon Corp., Eddystone Station Unit #1 is a 325 MW pulverized-coal-fired plant that pushed the technology of steam-electric generating plants. When built in 1960, engineers sought to make a more efficient plant using higher temperatures and pressures and larger machines. Previous experience at Philo 6 (Zanesville, Ohio, 1957) had demonstrated supercritical steam plants would work, so engineers pushed beyond that frontier to even larger machines and efficiencies.

YearAdded:
2003
Image Credit: Image Caption: Eddystone Station Era_date_from: 1960
Subscribe to Combustion Engineering Inc.
Eddystone Station Unit #1

Operated by the Philadelphia Electric Company (PECO), now known as Exelon Corp., Eddystone Station Unit #1 is a 325 MW pulverized-coal-fired plant that pushed the technology of steam-electric generating plants. When built in 1960, engineers sought to make a more efficient plant using higher…

Read More
This fusion-welded drum, tested during 1930, was the first in a series tested at Combustion Engineering Inc. that led to the industrial acceptance of welding for the fabrication of boiler drums. Replacing riveting for steam power plants, electric arc fusion welding permitted increased efficiencies… Read More

We hope you enjoyed this essay.

Please support this 70-year tradition of trusted historical writing and the volunteers that sustain it with a donation to American Heritage.

Donate

Stay informed - subscribe to our newsletter.
The subscriber's email address.