This fusion-welded drum, tested during 1930, was the first in a series tested at Combustion Engineering Inc. that led to the industrial acceptance of welding for the fabrication of boiler drums. Replacing riveting for steam power plants, electric arc fusion welding permitted increased efficiencies through higher working pressures and temperatures and fabrication of larger units of improved safety. Welding was then rapidly extended to fabrication using optimum alloys for pressure vessel and structural application.
Papers published by A. J.
37402

YearAdded:
Image Credit:
Image source: Engrailhistory.info
Image Caption:
Fusion-welded Test Boiler Drum
Era_date_from:
1930
1980

This fusion-welded drum, tested during 1930, was the first in a series tested at Combustion Engineering Inc. that led to the industrial acceptance of welding for the fabrication of boiler drums. Replacing riveting for steam power plants, electric arc fusion welding permitted increased efficiencies… Read More