Skip to main content

ON

St. Clair Tunnel
Society: ASCE Main Category: Civil Sub Category: Tunnels Era: 1890-1899 DateCreated: 1891 Beneath the St. Clair River Sarnia State: ON Zip: N7T 8G8 Country: Canada Website: http://www.asce.org/Project/St--Clair-Tunnel/ Creator: Hobson, Joseph , Beach, Alfred

A Day's Pay According to tunnel records, the following pay rates were established for the 600-700 laborers required for this project: 

YearAdded:
1991
Image Credit: Public Domain Image Caption: Postcard of the west end St. Clair River Tunnel in Port Huron, Michigan, United States. Era_date_from: 1891
Peterborough Hydraulic (Canal) Lift Lock
Society: ASME Main Category: Mechanical Sub Category: Water Transportation Era: 1900-1909 DateCreated: 1904 353 Hunter St East Peterborough State: ON Zip: Country: Canada Website: https://www.asme.org/about-asme/who-we-are/engineering-history/landmarks/205-peterborough-hydraulic-canal-lift-lock Creator: Rogers, Richard Birdsall , Dominion Bridge Company

Opened July 9, 1904, this lift lock is the highest of its type in the world, transferring boats between two water levels in a single 19.8 m (65 ft.) lift. Designed in place of conventional locks, which would have lengthed the time considerably to transverse a gradual drop, this lift lock was a unique solution made feasible. It operates on a balance principle. Each boat chamber is supported by a ram, 2.28 m (7.5 ft.) In diameter. These move up and down inside water-filled cylinders connected by a pipe.

YearAdded:
1999
Image Credit: Courtesy Flickr/Mac Armstrong (CC BY-SA 2.0) Image Caption: Peterborough Hydraulic Canal Lift Lock Era_date_from: 1904
Subscribe to ON
Peterborough Hydraulic (Canal) Lift Lock

Opened July 9, 1904, this lift lock is the highest of its type in the world, transferring boats between two water levels in a single 19.8 m (65 ft.) lift. Designed in place of conventional locks, which would have lengthed the time considerably to transverse a gradual drop, this lift lock was a…

Read More
St. Clair Tunnel

A Day's Pay According to tunnel records, the following pay rates were established for the 600-700 laborers required for this project: 

  1. 17.5 cents per hour for diggers 
  2. 15 cents per hour for erectors 
  3. 12.5 cents per hour for others 
  4. One additional…
Read More

We hope you enjoyed this essay.

Please support this 70-year tradition of trusted historical writing and the volunteers that sustain it with a donation to American Heritage.

Donate

Stay informed - subscribe to our newsletter.
The subscriber's email address.