Experimental Breeder Reactor I
Society
Main Category
Sub Category
Era
Date Created
Location Country
us
Coordinates
43.51132, -113.0064
Address1
EBR-I Building
Address2
U.S. Highway 20-26
City
Arco
State
Country
Zip
Creator

At this facility on 20 December 1951 electricity was first generated from the heat produced by a sustained nuclear reaction providing steam to a turbine generator. This event inaugurated the nuclear power industry in the United States. On 4 June 1953 EBR-I provided the first proof of "breeding" capability, producing one atom of nuclear fuel for each atom burned, and later produced electricity using a plutonium core reactor.

The idea for a breeder reactor (a reactor that could produce more fuel than it uses) first occurred to scientists working on the nation's wartime atomic energy program in the early 1940s. Experimental evidence indicated that the breeding of nuclear fuel was possible in a properly designed reactor, but time and resources were not then available to pursue the idea.

After World War II, the newly established Atomic Energy Commission (now the Department of Energy) assigned some of the nation's nuclear skills and resources to developing peaceful uses of the atom. The large bodies of uranium ore found in the 1950s were unknown then, and, since uranium was in very short supply, it was decided that the first power reactor would attempt to prove the theory of fuel breeding.

EBR-I construction began in late 1949 at the National Reactor Testing Station in Idaho, now called the Idaho a National Engineering and Environmental Laboratory (INEEL). Early in 1951, a few months before the EBR-I building was completed, nine staff members from the Atomic Energy Commission's Argonne National Laboratory arrived on the scene to install the reactor, which they had designed at their lab near Chicago. The first attempt to operate the new reactor, in May of that year, was not successful. It was determined that there was not enough fuel in the core. Acquiring additional uranium and fabricating slightly larger fuel rods took nearly three months. Then on August 24, Walter Zinn and his Argonne staff brought EBR-I to criticality (a controlled, self- sustaining chain reaction) with a core about the size of a football. Four months of low power operation followed while the operators studied their new creation.

On December 20, 1951, the first historic experiment at EBR-I began. The reactor was started up and the power gradually increased over several hours. At 1:50 p.m., the first usable amount of electricity ever generated from nuclear power began flowing from the turbine generator. Four light bulbs glowed brightly to inaugurate the birth of nuclear-generated power. The next day, the experiment was repeated, and sufficient electricity to power the EBR-I building was generated.

Image Credit
Courtesy Wikipedia/US Department of Energy
Image Caption
The four lit light bulbs demonstrated the first use of nuclear electricity at Argonne National Laboratory.

We hope you enjoyed this essay.

Please support this 70-year tradition of trusted historical writing and the volunteers that sustain it with a donation to American Heritage.

Donate

Stay informed - subscribe to our newsletter.
The subscriber's email address.