Skip to main content
Conwy Tubular Bridge
Society
Main Category
Sub Category
Era
Date Created
Location Country
us
Coordinates
53.280278, -3.823611
Address1
River
City
Conwy
State
Country

Built by Robert Stephenson to carry the Chester and Holyhead Railway across the River Conwy, this bridge was erected between 1846 and 1848. It consists of a single span 400 feet long, formed by two parallel rectangular wrought iron tubes, each weighing 1300 tons. Masonry towers were built on the abutments and topped with battlements and turrets to harmonize with the nearby Conwy Castle. The Conwy Tubular Bridge was the first railway bridge in which trains ran through the main girders. It represents a pioneering use of wrought iron for bridges. The associated research and model testing led to major advances in the development of box-section girder elements and encouraged widespread adoption of plate girder wrought iron bridges in the second half of the nineteenth century.

"It is very similar in design to his other great bridge on the same line, the Britannia Bridge and, like it, marked a significant advance in the art of bridge building."
- Civil Engineering Heritage: Wales & West Central England, edited by Roger Cragg
Image Credit
Original Photo: Flickr/Glenn J. Mason
Image Caption
Conwy Tubular Bridge

We hope you enjoyed this essay.

Please support this 70-year tradition of trusted historical writing and the volunteers that sustain it with a donation to American Heritage.

Donate

Stay informed - subscribe to our newsletter.
The subscriber's email address.